PDA

View Full Version : 66.159.239.0/24 and 64.235.242.0/24


Steven
07-07-2004, 09:17 PM
We'll be moving these servers as previously stated on Friday July 9, 2004 starting at 8:00 PM PST. These moves should be fairly quick taking about 20 minutes or so each. There are 4 servers to move on the 64.235.242.0/24 which are
client dedicated
diablo
lexus
viper

There are 6 servers to move on 66.159.239.0/24 and they are:
Ferrari
Porsche
Jaguar
GTO
2 Dedicated Client Servers.

All other servers have already been moved to our upgraded space. This is just a physical move, nothing will change except for upgraded capacity (network/overall space) to our servers and equipment.

-Steven

Steven
07-09-2004, 06:31 PM
Unfortunately we have to wait for the 66.159.239.0/24 move as a last second final testing yielded a bad fiber optic line to our cage. We're still moving forward on the 64.235.242.0/24 move tonight.

We will keep you posted on the 66.159.239.0/24 move as we are hoping it will be fixed tomorrow. I am very sorry to report this now, but we have to test everything properly before moving anything. There is no downtime associated with this.

-Steven

Steven
07-09-2004, 09:12 PM
We're finished with the move. All in all very short :) We started at 9:30 PM as well.

-Steven

Steven
07-19-2004, 09:41 AM
We are doing the 66.159.239.0/24 move Tuesday July 20, 2004 at 8:00 PM PST GMT-8:00.

This affects the following servers:
Ferrari
Porsche
Jaguar
GTO
2 client Dedicated.

We anticipate it will take 30 minutes or so to have everything fully operational once we shut down the servers.

-Steven

Steven
07-20-2004, 04:40 PM
Friendly reminder about tonight. We'll update this thread throughout the process.

-Steven

Steven
07-20-2004, 07:31 PM
We are starting in 5 minutes.

-Steven

Steven
07-20-2004, 08:26 PM
We're done :)

-Steven