Steven
07-07-2004, 09:17 PM
We'll be moving these servers as previously stated on Friday July 9, 2004 starting at 8:00 PM PST. These moves should be fairly quick taking about 20 minutes or so each. There are 4 servers to move on the 64.235.242.0/24 which are
client dedicated
diablo
lexus
viper
There are 6 servers to move on 66.159.239.0/24 and they are:
Ferrari
Porsche
Jaguar
GTO
2 Dedicated Client Servers.
All other servers have already been moved to our upgraded space. This is just a physical move, nothing will change except for upgraded capacity (network/overall space) to our servers and equipment.
-Steven
client dedicated
diablo
lexus
viper
There are 6 servers to move on 66.159.239.0/24 and they are:
Ferrari
Porsche
Jaguar
GTO
2 Dedicated Client Servers.
All other servers have already been moved to our upgraded space. This is just a physical move, nothing will change except for upgraded capacity (network/overall space) to our servers and equipment.
-Steven